← Projects
Completed Works

Example Job Scenarios
01
Bulk Carrier · Crane
Boom cylinder leak: overhaul and pressure test, back in operation.
02
Tanker · Windlass
Brake slipping: lining replacement and brake test.
03
Container Ship · HPU
Overheating: cooler and filter renewal.
04
General Cargo · Crane Jib
Jib damage: structural repair, pin/bush renewal and function test.
05
Tanker · Hose Crane
Oil leak on hoisting motor: shaft seal and O-ring replacement.
06
New Equipment · Commissioning
New winch installation, flushing and on-load acceptance test.
Example Work Areas
- —Deck crane hydraulic circuit renewal
- —Windlass brake and clutch overhaul
- —Hatch cover cylinder overhauls
- —Hydraulic power unit replacement
- —Davit winch annual inspection and service
On Every Project
Pre-job inspection, written quotation, planned execution and delivery with test report are our standard process.

