← Service & Technical Support
Installation, Commissioning & Testing

Much of an equipment's life is decided at first start-up. A dirty circuit, wrong setting or missing test soon turns into a breakdown, so we commission step by step and on record.
Commissioning Steps
- 01Mechanical installation and alignment
- 02Flushing and oil filling
- 03No-load run and leak check
- 04Pressure and speed settings
- 05Function test under load
- 06Handover report
Scope of Work
- —Foundation, connection and alignment checks before installation
- —Hydraulic circuit flushing and oil cleanliness checks
- —First start-up, pressure and relief valve settings
- —Limit switch, brake and control function tests
- —Crew operating briefing
Our Process
- 01Request and briefing: vessel, port, equipment and fault details
- 02Inspection and testing on board or in the workshop
- 03Findings report and quotation
- 04Repair / overhaul and part replacement
- 05Function and pressure tests, delivery report
Documents Delivered
01
Service Report
Work done, findings and recommendations.
02
Replaced Parts List
With part numbers and quantities.
03
Test Records
Pressure, flow or load test results.
04
Photo Documentation
Before / after condition photos.
Related Pages

Crane Maintenance & Repair
Periodic maintenance, overhaul and repair.

Windlass Maintenance & Repair
Maintenance of windlass and winch systems.

Hydraulic Pump Repair
Pump disassembly, testing and repair.

Hydraulic Motor Repair
Hydraulic motor overhaul and testing.

Hydraulic Cylinder Overhaul
Seal replacement, honing and chrome plating.

Fault Diagnosis & Technical Service
Systematic fault analysis and resolution.
