← Service & Technical Support

Installation, Commissioning & Testing

Installation, Commissioning & Testing

Much of an equipment's life is decided at first start-up. A dirty circuit, wrong setting or missing test soon turns into a breakdown, so we commission step by step and on record.

Commissioning Steps

  • 01Mechanical installation and alignment
  • 02Flushing and oil filling
  • 03No-load run and leak check
  • 04Pressure and speed settings
  • 05Function test under load
  • 06Handover report

Scope of Work

  • —Foundation, connection and alignment checks before installation
  • —Hydraulic circuit flushing and oil cleanliness checks
  • —First start-up, pressure and relief valve settings
  • —Limit switch, brake and control function tests
  • —Crew operating briefing

Our Process

  • 01Request and briefing: vessel, port, equipment and fault details
  • 02Inspection and testing on board or in the workshop
  • 03Findings report and quotation
  • 04Repair / overhaul and part replacement
  • 05Function and pressure tests, delivery report

Documents Delivered

01

Service Report

Work done, findings and recommendations.

02

Replaced Parts List

With part numbers and quantities.

03

Test Records

Pressure, flow or load test results.

04

Photo Documentation

Before / after condition photos.

Aksinos Marine

Quote / Request Form

Request subject

Installation, Commissioning & Testing

Contact Details
* Required fields